Shipping
Estimates reflect the selected item and order timing. Dispatch is when your order leaves the supplier; arrival also depends on carrier transit and your destination.
Read shipping policy →Select an available option combination to check delivery and pickup.
Estimates depend on stock, order cutoff, destination and working days. Final options are confirmed at checkout or with our team.
Create a branded bin label for this product.
Product details
If your cooler is equipped with a bleed-off, disconnect it. Remove all loose material from pads and reservoir. Rinse out the pan area. Fill reservoir with clean water and add contents of JR's ONCE THROUGH bottle.
IMPORTANT
Remove blower drive-belt, replace pad panels and circulate water for 6 to 12 hours. If build up is excessive, additional treatments of JR's ONCE THROUGH CLEANER may be required. When cleaning is finished, attach hose to drain and flush reservoir. Do not allow water flushed out of reservoir to settle on roof, side walks, driveways or plants. Then simply reinstall drive-belt, and refill reservoir with clean fresh water. For better cooler performance and proper maintenance add JR's EVAPORATIVE COOLER TREATMENT when refilling reservoir. It will cause your home to become cooler, and your air much cleaner, as well as save you on the use of water.
Technical information
Estimates reflect the selected item and order timing. Dispatch is when your order leaves the supplier; arrival also depends on carrier transit and your destination.
Read shipping policy →Availability depends on the product, location and order requirements. Check the options above or contact our team with your SKU and delivery address.
Call (915) 598-8598 →